Build Your Next Project in Half the Time

See exactly how NCC prefabricated panels compress your schedule, cut labor, and reduce total project cost — backed by real project data.

150,000 SF
10,000 SF500,000 SF
0
80% reduction
Days Saved
$0
8% reduction
Direct Cost Savings
$0
GC Overhead Savings
0
81% reduction
Man-Hours Saved
BBB A+ Rated
13 Years in Business
~9M Sq Ft Delivered
30+ Years Construction Exp.

Three Reasons GCs Choose Panels

Click any card to dive into the details.

4
2

Schedule Compression

Panels compress your framing timeline dramatically — every day saved is money in your pocket.

Total Schedule Comparison

Stick Framing93.8 days
NCC Panels18.7 days
75.1 days saved
= $262,850 in general conditions($3,500/day)

Level-by-Level Breakdown

PhaseStick (days)Panels (days)Saved
B1 Level 211.77.83.9
B1 Level 311.77.83.9
B1 Level 411.74.47.3
B1 Level 511.74.47.3
B2 Level 211.77.83.9
B2 Level 311.77.83.9
B2 Level 411.74.47.3
B2 Level 511.74.47.3

Labor Reduction

Fewer hours, smaller crews, faster completion — in a market where finding framers is harder than ever.

Man-Hours Comparison

Stick Framing7,800 hrs
NCC Panels1,467 hrs
81% fewer labor hours (6,333 hours saved)

Crew Size & Labor Reality

Stick Framing — 8 workers

1 Superintendent

1 Lead framer

4-5 Framers (skilled carpenters)

1-2 Laborers

NCC Panels — 5 workers

1 Crane operator

1 Signal person

2-3 Installers (bolt/nail-up)

The Labor Shortage Reality

Finding 8 skilled framers who can commit to a multi-month project is increasingly difficult. Panel installation requires only 5 workers — and they finish 80% faster. In today's labor market, the crew you can't hire costs more than the panels.

Cost Breakdown

Panels shift cost from labor to material — but the total is lower. See where every dollar goes.

Cost Composition

Panels shift cost from labor to material — but the total is lower.

Stick Total
$2,374,594
NCC Total
$2,185,182
Save $189,412

The Hidden Cost Most Comparisons Miss

Every day your project runs costs approximately $3,500/day in general conditions — superintendent salary, insurance, equipment rental, portable facilities, and project overhead. These costs don't show up in a framing bid, but they're very real.

75.1
Days saved
$3,500
Per day in GC costs
$262,850
Saved in general conditions

This is on top of the $189,412 in direct cost savings — bringing your total project savings to $452,262

Beyond the Numbers

Cost and schedule aren't the only advantages. Panels deliver better quality, safety, and sustainability.

Factory-Controlled Quality

Every panel is built in a controlled facility with jigs, templates, and quality checks. No weather delays, no warped lumber from sitting in the rain, no layout errors from field measurements.

Zero field rework

Safer Job Sites

Fewer worker-days at height means fewer opportunities for falls — the #1 cause of construction fatalities. Panel installation crews use crane-assisted lifts, not manual overhead framing.

67% fewer worker-days on-site
See our 6-foot rule program

Less Waste

Factory cutting optimizes every board foot. Stick framing generates 10% waste on average vs. 3% with panels. On a 250K SF project, that's 25 tons of lumber saved from the landfill.

3% waste vs. 10%

Real-World Proof

See how NCC panels performed on an actual multi-family project.

Real Project Data

251K SF Multi-Family Project

251,002 SF across 3 buildings — actual cost and schedule comparison between traditional stick framing and NCC prefabricated panels with floor cassettes.

251,002 SF
Project Size
3 buildings, 6 levels
88
Days Saved
157 → 69 days
$297,245
Cost Saved
$4,093,907 → $3,796,661
10,240
Man-Hours Saved
79% reduction
“Nobles delivers a high-quality product centralized around front-end coordination and detailed execution through the project's lifespan. NCC has been the gold standard of floor cassette manufacturing for many years, prioritizing safety and efficiency for their clients.”
TP
Tony Pellegrini
Self Perform Manager, Cahill Contractors
“NCC's prefabricated floor cassette system dramatically improved installation efficiency on the Fresno State Student Housing project. Compared to conventional framing on the lower floors, the cassette system allowed us to reduce install time by nearly 80% while maintaining the same structural design.”
JC
Jason Cavallini
Project Manager, UC Construction

A note on flexibility

Panel projects require finalized plans before manufacturing. Stick framing offers more field flexibility for design changes. Factor this into your decision based on your project's design maturity.

Full Comparison

Every metric, side by side.

Detailed Metrics Comparison

MetricStick FramingNCC PanelsWinner
Total Days93.818.7
Man-Hours7,8001,467
Total Cost$2,374,594$2,185,182
Cost / SF$15.83$14.57
Crew Size8 workers5 workers
Waste10% (15 tons)3% (4.5 tons)
Safety Exposure750 worker-days93 worker-days
GC Overhead Savings$262,850
Total Project Savings$452,262

Common Questions

Answers to the objections we hear most from GCs and developers.

Ready to Build Smarter?

Get your custom comparison report or talk to our team about your next project.