Cleaner. Safer. Faster.

See how NCC's prefabricated components transform job sites — from delivery to completed structure in a fraction of the time. NCC manufactures and delivers; your crew installs.

Installation Process

How our components go from truck to structure — installed by your crew.

1

Site Preparation

Foundation and podium deck are prepared and inspected. NCC coordinates delivery timing with the general contractor to ensure seamless sequencing.

2

Component Delivery

Prefabricated panels and cassettes arrive on trucks and trailers, labeled and sequenced in installation order. No lay-down area required.

3

Crane Set

Components are crane-lifted into position by your crew. Floor cassettes are placed first, followed by walls, then roof panels. Each cassette provides an immediate solid working platform.

4

Connection & Securing

Your crew connects, fastens, and secures panels per the engineer's specifications. A crew of 3 can set up to 5,000 sq ft per day.

Why Our Installs Are Different

The NCC advantage on every job site.

No on-site cutting — only empty glue containers as debris
Crew of 3 replaces crews of upwards of 40
5,000 sq ft set per day
No lay-down area needed
Components go truck-to-structure
Safer — fewer workers, less risk
60-70% faster than stick framing
All-weather factory manufacturing