See How We Build
Before the Crane
A photo story in six chapters — from our factory in Susanville to jobsites across California. Design. Fabricate. Load. Deliver. Hoist. Set.
Chapter 1
The Campus
Susanville, California. 9 million square feet built.

Susanville, California — where every panel begins

Our 120,000 sq ft fabrication facility

Purpose-built production line for floor cassettes

Panels move from assembly to staging in minutes

Year-round production — weather never stops the line
Chapter 2
Precision
Every panel leaves our facility squared, fastened, and inspected. No field-quality variability.
Chapter 3
In Transit
Panels arrive labeled and sequenced in installation order. No lay-down area needed.

Loaded and strapped — ready for the road

Sequenced in installation order — first panel on top

Volumetric modules ship fully framed with openings cut

Staging yard — panels queue for next-day delivery

From Susanville to your jobsite — anywhere in California

Volumetric modules — windows and doors pre-framed

Panels labeled and mapped to your floor plan

Loaded and strapped — ready for the road

Sequenced in installation order — first panel on top

Volumetric modules ship fully framed with openings cut

Staging yard — panels queue for next-day delivery

From Susanville to your jobsite — anywhere in California

Volumetric modules — windows and doors pre-framed

Panels labeled and mapped to your floor plan
Chapter 4
The Moment
Crane-setting a building — smooth, efficient, seamless. Photos speak.

The moment it all comes together

A crew of 3 — unloading a bunk of panels from the trailer

From truck to framed floor — in days, not weeks

No lay-down area needed — straight from truck to structure

Up to 5,000 square feet installed per day with a 3-person crew

Solid deck — safe to walk on immediately after placement. Learn about the 6-foot rule.

Multi-story installs — speed that transforms your schedule
A crew of 3. Up to 5,000 sq ft per day.
Tell us about your project and we'll show you what the schedule looks like with NCC.
Chapter 5
Setting Panels
Panels set, decks secured, buildings taking shape. The payoff.

D-ring tie-off points built into every panel — learn about the 6-foot rule.

Clean framing — ready immediately after setting panels

Floors and walls going up together — compressed schedule

Small crews, big results — 3 workers per crane pick

Factory precision visible from below — straight, true, consistent
Chapter 6
Trust
Don't take our word for it — hear from the GCs who build with us.
30+
Projects
9M+
Sq Ft
14
GC Partners
A+
BBB Rating
“Nobles delivers a high-quality product centralized around front-end coordination and detailed execution through the project’s lifespan. NCC has been the gold standard of floor cassette manufacturing for many years, prioritizing safety and efficiency for their clients.”
— Tony Pellegrini, Self Perform Manager, Cahill Contractors
“NCC’s prefabricated floor cassette system dramatically improved installation efficiency on the Fresno State Student Housing project. Compared to conventional framing on the lower floors, the cassette system allowed us to reduce install time by nearly 80% while maintaining the same structural design.”
— Jason Cavallini, Project Manager, UC Construction
Trusted by California's top general contractors










Your project could look like this.
Let's talk about what NCC can do for your next build.