Skip to content
NCC
Crane lifting prefab panel on construction site

For General Contractors

Frame Faster. With Fewer Workers. At Higher Quality.

NCC gives your project a prefabricated framing solution that compresses schedules, eliminates labor bottlenecks, and delivers factory-controlled quality — every panel, every time.

Why GCs Choose NCC

Practical advantages that impact your bottom line on every project.

Compress Your Schedule

Prefabricated floor cassettes install in days, not weeks. Our clients typically see 30-50% faster framing timelines, reducing your general conditions costs on every level.

Solve Labor Shortages

Stop waiting for large framing crews. NCC provides the panels — your crews install them with far fewer workers. A crew of 3 can set 5,000 sq ft per day, getting your framing scope done on schedule.

Factory-Controlled Quality

Every panel is built on a flat, level surface in a controlled environment. Squared, fastened, and inspected before it leaves our facility — no field-quality variability.

No Lay-Down Area Needed

Just-in-time delivery means panels go straight from the truck to the crane to their final position. Ideal for urban sites with limited staging space.

15-25% Net Savings

When you factor in reduced labor, shorter schedule, less waste, and fewer callbacks, many projects see 15-25% net savings on framing scope vs. stick framing.

BIM Pre-Coordination

NCC's design team models every component in BIM, coordinating with your architect and structural engineer before fabrication. Conflicts get caught in the model, not in the field.

Estimate Your Savings

See how much time and money prefab can save on your next project.

Savings Estimator

Enter your project details to see estimated savings with NCC prefabricated components vs. traditional stick framing.

Trusted by Leading GCs

Almost 9 million square feet delivered across California.

  • Nibbi Brothers
  • Liberty Construction
  • Ciarra Construction
  • Devcon Construction
  • Cahill Contractors
  • Suffolk Construction
  • Thompson Builders
  • Broward Builders
Crane setting NCC prefabricated panels on construction site
4200 Geary tower crane lifting floor cassette
Aerial drone view of multi-story wood-frame building under construction
Hunters View panel delivery with crane
Elevated view of framed floor with crane and San Francisco buildings

Let's Discuss Your Next Project

Send us your plans and we'll provide a scope assessment, pricing, and preliminary schedule within a week.